PPP Projects Listing

Telemedicine

This project is part of the healthcare projects package expected to be studied in 2025. Project information will be updated as it becomes available.

Main Phase Icon
Main Phase Projects Under Study
Sub Phase Icon
Sub Phase Under Study
Sector Icon
Sector Health
Contracting Authority Icon
Contracting Authority Ministry of Public Health
Contract Duration Icon
Contract Duration TBD
PPP Model Icon
PPP Model TBD
Project Cost Icon
Project Cost TBD
Location Icon
Location TBD

Durable Medical Equipment

This project is part of the healthcare projects package expected to be studied in 2025. Project information will be updated as it becomes available.

Main Phase Icon
Main Phase Projects Under Study
Sub Phase Icon
Sub Phase Under Study
Sector Icon
Sector Health
Contracting Authority Icon
Contracting Authority Ministry of Public Health
Contract Duration Icon
Contract Duration TBD
PPP Model Icon
PPP Model TBD
Project Cost Icon
Project Cost TBD
Location Icon
Location TBD

Integrated Material Recovery and Bulky Wast Sorting Facility

The project includes the establishment of an integrated Material Recovery Facility (MRF), in addition to the development of a Bulk Waste Sorting Plant (BWSP) to process large-sized materials that are currently 100% landfilled, contributing to the recovery of recyclables and reducing reliance on landfills.

Main Phase Icon
Main Phase Projects Under Study
Sub Phase Icon
Sub Phase Under Study
Sector Icon
Sector Waste Management
Contracting Authority Icon
Contracting Authority Ministry of Municipality
Contract Duration Icon
Contract Duration TBD
PPP Model Icon
PPP Model DBFOMT
Project Cost Icon
Project Cost TBD
Location Icon
Location Al Afja district